Gulliver

Chamber Rating
-
Woo
Dec 25th, 2019 -
Quacking Steve
Apr 25th, 2021 -
Peter Biggins
Jul 25th, 2020 -
Tim Haigh
May 11th, 2020
Contact Info
Questions & Answers
Q Where is Gulliver located?
A Gulliver is located at Gas Works Rd, Lowestoft, eng NR32 1UZ
Q What is the internet address for Gulliver?
A The website (URL) for Gulliver is: https://www.thriverenewables.co.uk/projects/ness-point-wind-farm/
Q How is Gulliver rated?
A Gulliver has a 4.5 Star Rating from 4 reviewers.
Ratings and Reviews
Gulliver
Overall Rating
Overall Rating
( 4 Reviews )
Quacking Steve on Google

Peter Biggins on Google

Tim Haigh on Google

Woo on Google
Wind turbine construction began: December 2004
Gulliver began generating electricity: January 2005
The Hub height (turbine base to rotor hub): 80m / 262ft
The Tip height (turbine base to blade tip): 126m / 413ft
Blade Size ( X 3 ): 10 tonnes each, 44.8m / 147ft long
Wind Turbine Rotor diameter: 92m / 301ft
The Nacelle (houses the gearbox and control systems): 83 tonnes, 11.2m / 37ft long, 3.3m /11ft wide, 3.8m / 12.5ft high