Complete Bathrooms (Lowestoft) Ltd
Chamber Rating
-
Mark Reid
The job was ment to be compleated in ten days wile we where away. We came back to not s lot of progress and the bathroom took best part of three more weeks of no bathroom and mess. The bath was danedged by leaving tiles in it wile standing in the bath. Basin was damaged abd Gary was ment to come back and cut replacement but never responded to my txt messages so I had to fit it myself. Tiling was good but oh do slow. This was possible because Gary never arrived before ten and spent most of the time on the phone to his girlfriend. The job was just messy slow and bits missed here and there like pipe clips shower head sliders fitted upside down tsps plumbed backwards and no isolation on bath fan. And a combo boiler that now does not work correctly and despite apparently having all trades Gary could not look st as not gas qualified, so I now have to find a gas engineer at my cost. Over all I'm sorry but I can not recommend.
Nov 11th, 2017 -
Luke Harmer
Oct 11th, 2017
Contact Info
- (150) 251-3881
Questions & Answers
Q What is the phone number for Complete Bathrooms (Lowestoft) Ltd?
A The phone number for Complete Bathrooms (Lowestoft) Ltd is: (150) 251-3881.
Q Where is Complete Bathrooms (Lowestoft) Ltd located?
A Complete Bathrooms (Lowestoft) Ltd is located at 32 Westland Rd, Lowestoft, eng NR33 9AD
Q What is the internet address for Complete Bathrooms (Lowestoft) Ltd?
A The website (URL) for Complete Bathrooms (Lowestoft) Ltd is: http://trustatrader.com/traders/complete-bathrooms-lowestoft-ltd-bathroom-fitters-waveney/
Q How is Complete Bathrooms (Lowestoft) Ltd rated?
A Complete Bathrooms (Lowestoft) Ltd has a 3.5 Star Rating from 2 reviewers.
Ratings and Reviews
Complete Bathrooms (Lowestoft) Ltd
Overall Rating
Overall Rating
( 2 Reviews )Mark Reid on Google
The job was ment to be compleated in ten days wile we where away. We came back to not s lot of progress and the bathroom took best part of three more weeks of no bathroom and mess. The bath was danedged by leaving tiles in it wile standing in the bath. Basin was damaged abd Gary was ment to come back and cut replacement but never responded to my txt messages so I had to fit it myself.
Tiling was good but oh do slow. This was possible because Gary never arrived before ten and spent most of the time on the phone to his girlfriend.
The job was just messy slow and bits missed here and there like pipe clips shower head sliders fitted upside down tsps plumbed backwards and no isolation on bath fan. And a combo boiler that now does not work correctly and despite apparently having all trades Gary could not look st as not gas qualified, so I now have to find a gas engineer at my cost. Over all I'm sorry but I can not recommend.
Luke Harmer on Google